Proof Engineers
  • Solutions
  • Case Studies
  • Client Portal
  • Contact

Case Studies

Real results from site deployments: productivity gains, road condition improvements, and operational insights.

Focused vs Scattered grading intensity map
+122.7%

Grader Productivity Optimisation - Hunter Valley Coal Mine

Read Case Study→
Western Australia Lithium Mine trial - road improvement metrics
+6.6 km/h

Western Australia Lithium Mine: 1.5-Month Trial Comparison

Read Case Study→
RCM before - poor dig-floor conditions
RCM after - optimised surface
+2.1 km/h

RCM Maintenance Study: Dig-Floor (EX221)

Read Case Study→
Indonesia Kalimantan haul road - speed improvement and rainfall results
+43%

Proof Engineers: Haul Road Improvement (Indonesia Kalimantan)

Read Case Study→

PO Box 2844, Burleigh Heads QLD 4220, AUSTRALIA

+61 7 5522 0855·info@proofengineers.com.au

Environmental PolicyHealth & Safety PolicyPrivacy PolicyLegal Disclaimer

© 2026 Proof Engineers. All rights reserved.